Replace your PM5560 with APM-96Q with selected Ethernet option
Replacing a Schneider PM5560 involves checking the network services it supports alongside its electrical readings. Your meter may connect downstream devices, measure neutral current or serve data through a gateway. Blue Jay APM-96Q with the selected Ethernet option offers a replacement route for defined three-phase power, energy and harmonic monitoring. This page helps you separate those monitoring duties from functions needing additional equipment or supporting evidence, including dual-port networking and IEC 0.2S requirements. Share your network diagram, CT arrangement and required protocols to request a configuration that identifies the meter, accessories and commissioning changes needed for your installation.
Compare specifications of Schneider PM5560 and APM-96Q
| Selection point | Schneider PM5560 | APM-96Q | What this means for replacement |
| Nominal CT input | 1 A / 5 A | 1 A / 5 A options | Order the installed CT secondary; verify measurement and overload limits. |
| Active-energy accuracy | IEC 62053-22 Class 0.2S | active energy 0.2; equivalent 0.2S evidence unverified | Require configuration-specific 0.2S evidence if the project specifies it. |
| Neutral-current input | 4th CT input for measured neutral current | Three-phase current inputs; equivalent 4th CT input unverified | Define a separate verified solution where measured neutral current is mandatory. |
| Ethernet and protocols | 2 Ethernet ports; gateway; web server; several protocols | Optional Ethernet Modbus TCP; matching port and gateway functions unverified | Account for daisy-chain traffic, downstream devices and required protocols. |
| Voltage measurement | Reference 20-400 V L-N; 20-690 V L-L wye | 100 / 220 / 380 V ordering options | Select voltage rating and connection; include VTs where required. |
| Control power | Reference nominal 100-480 V AC; 125-250 V DC; check tolerances | 85-265 V AC/DC standard; 48 V DC or 380 V AC customization published | Specify the power version for the actual site supply; confirm its full operating range. |
| Logs and tariffs | 1.1 MB logs; 8 tariffs; 52 alarms | 4 rates / 12 segments; 50 SOE; optional logging memory | Compare log intervals, retention, tariff logic and exported records. |
| Opening and depth | 96 mm front; product depth 77 mm | Manual opening 91 x 91 mm; depth drawing 74 mm | Check the actual opening, fixing and cable clearance. |
PM5560 replacement configuration
Check and configure the replacement
1 Identify the network job of the PM5560
Show both Ethernet cables, every downstream meter and the protocol used by the supervisory system. A TCP option alone does not reproduce a two-port chain, serial gateway, BACnet or EtherNet/IP.
2 Define current and accuracy requirements
Record all CTs, including any neutral CT, and the required active-energy standard. The APM documents publish 0.2; request applicable evidence for a project requiring IEC 0.2S and a defined solution for direct neutral measurement.
3 Select inputs and records
Match the actual voltage, supply range, opening and I/O circuits. Agree the tariff schedules, log intervals, retention and record formats before selecting firmware and memory options.
4 Commission the complete data path
Install the agreed network equipment and rebuild the point map. Test downstream communication as well as local readings, accumulated energy, alarms and any retained billing or reporting workflow.
Applications for this replacement
Suitable for plant monitoring and control-panel projects where the replacement scope is three-phase electrical data and a defined Modbus connection. A PM5560 acting as a neutral-current meter, network gateway or multi-protocol server needs those duties included in the design.